Welcome to Shandong Hongfan Power Technology Co.,Ltd

Fuel injection pump left BH6Z140ZT Z12V.12.00 jinan diesel engine G12V190PZL PZ12V190B CO810F


Pictures Show:

BH6Z140ZT

Tips for maintaining Jinan 12V190 Diesel Engine

BH6Z140ZT

When operating a Jichai 12V190 diesel engine, it is essential to follow strict precautions to ensure optimal performance, longevity, and safety. Below are key guidelines to observe:

1. Read the Manual and Understand the Engine

  • Carefully read the operation manual to familiarize yourself with the structural features and operation procedures of the Jichai 190 series diesel engine.

2. Use the Recommended Fuel and Engine Oil

  • Always select fuel and engine oil according to the specified types and brands in the manual.

  • Ensure the fuel storage container is clean. Precipitate and filter the fuel before use.

  • Maintain cooling water quality and add anti-rust emulsion as required.

3. Follow Technical Maintenance Regulations

  • Implement technical maintenance according to the prescribed cycle.

  • Perform routine inspections and preventive maintenance to avoid engine failures.

4. Proper Cold Start Procedure

  • After a cold start, do not load the engine immediately.

  • Wait until the cooling water temperature reaches above 40°C before gradually applying a load.

5. Avoid Prolonged Idling

  • Do not run the 12V190 diesel engine at idle for extended periods without load to prevent engine damage.

6. Monitor Engine Operation and Keep Records

  • Continuously monitor the operating status of the diesel engine.

  • Maintain operation records as required.

  • If any abnormalities occur, identify the cause immediately and take corrective action.

  • In case of automatic shutdown, determine the cause before restarting.

7. Avoid Unauthorized Disassembly

  • Do not disassemble engine components, especially parts related to the fuel supply system and supercharger, unless necessary.

  • If disassembly is required, follow the prescribed procedures and reinstallation guidelines.

  • Parts affecting technical parameters (e.g., valve clearance, fuel supply advance angle) must be rechecked and adjusted after reinstallation.

  • Do not unseal any factory-sealed parts during operation.

8. Inspect Before Using a Stored Engine

  • If using a new engine that has exceeded its storage period or reactivating an old engine, perform a full inspection before installation.

  • Open the Jichai 190 cylinder head, inspect the cylinder liner, and rotate the supercharger turbine to check for abnormalities.

  • If rust or other issues are found, conduct necessary maintenance before use.

By following these precautionary measures, you can ensure the safe, efficient, and long-term operation of your Jichai 12V190 diesel engine.



Quickly Inquiry

Shandong Hongfan Power Technology Co.,Ltd